Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 22, 2020, 09:13 AM
  • 02 0012_02 0011_06222020_022629.mp4

Date
06/22/2020
W/O
833685
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00234
PipeID
P03038
Time
2:13 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7736
Sewer Name
ARTESIA EXTENSION TRUNK
City
BELLFLOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
38
Purpose
Routine Assessment
Project
RFIR_WO_833685_TV02341_JUN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
12 in.
Upstream MH
02 0011
Downstream MH
02 0012
Dir. of Survey
Upstream
Length Surveyed
391 ft.
Total Length
391 ft.
Structural Index
3
Structural Quick
4N3O
Structural Rating
696
O&M Index
3
O&M Quick
3121
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
701
Pipe schematic from manhole 02 0011 to 02 0012
MH: 02 0011MH: 02 0012upstream0 ft. AMH - Upstream Manhole, Survey Ends - 02 00120 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE1 ft. MGO - General Observation - ROACHES @ MH1.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish47.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"87.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN207.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES208.7 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN244.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"333.4 ft. TBI - Tap Break-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: NO, 6", 1"363.5 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"366.8 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES388.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start389 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start389 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start391 ft. MWL - Water Level, 20 %of cross sectional area391 ft. MWM - Water Mark, 25 %of cross sectional area391 ft. AMH - Downstream Manhole, Survey Begins - 02 0011

Observation photos (6)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 15 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: YES

    24.2 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES

  • Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    27.5 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: NO, 6", 1"

    57.6 ft. - Tap Break-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: NO, 6", 1"

  • Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    182.3 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    183.5 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (20)

DistanceCodeObservation
0MWL
2CM
391AMH02 0012
388SSS
0MWM
343.1TFC
146.1TFC
388CM
391MGOCONN @ MH 3 O'CLOCK/ACTIVE
2SSS
389.1FM
2.1FM
390MGOROACHES @ MH
57.6TBI
24.2DAGS
183.5CM
27.5TBA
0AMH02 0011
182.3TBOPEN
303.5TFOPEN

Properties (7)

additional_info
SC411395
custom_field_three
MULTIPLE FRACTURE'S/ MULTIPLE CRACKS
custom_field_two
2
customer
1
datetime
2020-06-22T02:13:23-07:00
documentation
PROPIPE
is_lateral_inspection
false