Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 8, 2020, 10:17 AM
  • 05 1487_05 1486 _06082020_032830.mp4

Date
06/08/2020
W/O
833689
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06713
Time
3:17 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7719
Sewer Name
EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_833689_TV05300_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
24 in.
Upstream MH
05 1486
Downstream MH
05 1487
Dir. of Survey
Upstream
Length Surveyed
291.9 ft.
Total Length
291.9 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
290
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
290
Pipe schematic from manhole 05 1486 to 05 1487
MH: 05 1486MH: 05 1487upstream0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 05 148778.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"236.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN289 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start289 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start289.9 ft. MGO - General Observation - 55% MAG COAT291.9 ft. MWL - Water Level, 10 %of cross sectional area291.9 ft. MWM - Water Mark, 15 %of cross sectional area291.9 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE291.9 ft. AMH - Downstream Manhole, Survey Begins - 05 1486291.9 ft. MGO - General Observation - ROACHES @ MH291.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
2.9SSS
2.9SAP
291.9SAP
0MWL
0MWM
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
0AMH05 1486
0MGOROACHES @ MH
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
213.4TFC
2MGO55% MAG COAT
291.9SSS
55.2TFOPEN
291.9AMH05 1487

Properties (7)

additional_info
SC411376
custom_field_three
AGGREGATE PROJECTING/ SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2020-06-08T03:17:56-07:00
documentation
PROPIPE
is_lateral_inspection
false