Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 8, 2020, 10:06 AM
  • 05 1486_05 1485 _06082020_031722.mp4

Date
06/08/2020
W/O
833689
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06712
Time
3:06 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7719
Sewer Name
EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_833689_TV05300_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
24 in.
Upstream MH
05 1485
Downstream MH
05 1486
Dir. of Survey
Upstream
Length Surveyed
229.9 ft.
Total Length
229.9 ft.
Structural Index
3
Structural Quick
3322
Structural Rating
13
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
13
Pipe schematic from manhole 05 1485 to 05 1486
MH: 05 1485MH: 05 1486upstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. AMH - Upstream Manhole, Survey Ends - 05 14860 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish61.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"65.4 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES66 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN71.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN127 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN179.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"191.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN191.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN227.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start227.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start227.9 ft. MGO - General Observation - 50% MAG COAT229.9 ft. AMH - Downstream Manhole, Survey Begins - 05 1485229.9 ft. MWL - Water Level, 10 %of cross sectional area229.9 ft. MWM - Water Mark, 15 %of cross sectional area

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    164.5 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
229.9MGOCONN @ MH 9 O'CLOCK/ACTIVE
38.8TFOPEN
164.5FL
2MGO50% MAG COAT
229.9MGOCONN @ MH 3 O'CLOCK/UNKNOWN
229.9AMH05 1486
102.9TFOPEN
0AMH05 1485
50.7TFC
0MWL
163.9TFOPEN
0MWM
2.1SAP
158.5TFOPEN
229.9SSS
229.9SAP
2.1SSS
38.8TFOPEN
168TFC

Properties (7)

additional_info
SC411376
custom_field_three
AGGREGATE PROJECTING/ SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2020-06-08T03:06:23-07:00
documentation
PROPIPE
is_lateral_inspection
false