Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 10, 2020, 08:12 AM
  • 05 2330_05 1472_06102020_012056.mp4

Date
06/10/2020
W/O
833689
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06696
Time
1:12 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7722
Sewer Name
EL NIDO TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_833689_TV05300_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
27 in.
Upstream MH
05 2330
Downstream MH
05 1472
Dir. of Survey
Downstream
Length Surveyed
256.7 ft.
Total Length
256.7 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
255
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
255
Pipe schematic from manhole 05 2330 to 05 1472
MH: 05 2330MH: 05 1472downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 23302 ft. MGO - General Observation - 60% MAG COAT2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN93.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN178.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN223.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN256.7 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED256.7 ft. AMH - Downstream Manhole, Survey Ends - 05 1472256.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish256.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
223.3TFOPEN
93.8TFOPEN
256.7MGOCONN @ MH 3 O'CLOCK/CAPPED
2.1SSS
178.3TFOPEN
0MWL
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
256.7AMH05 1472
256.7SSS
5.2TFOPEN
0MGOROACHES @ MH
2.1SAP
0MWM
0AMH05 2330
2MGO60% MAG COAT
256.7SAP

Properties (7)

additional_info
SC411380
custom_field_three
AGGREGATE PROJECTING/ SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2020-06-10T01:12:01-07:00
documentation
PROPIPE
is_lateral_inspection
false