Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 9, 2020, 09:26 AM
  • 05 1478_05 1477_06092020_023922.mp4

Date
06/09/2020
W/O
833689
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06702
Time
2:26 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7721
Sewer Name
EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_833689_TV05300_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
27 in.
Upstream MH
05 1478
Downstream MH
05 1477
Dir. of Survey
Downstream
Length Surveyed
312.3 ft.
Total Length
312.3 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
310
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
310
Pipe schematic from manhole 05 1478 to 05 1477
MH: 05 1478MH: 05 1477downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 14782 ft. MGO - General Observation - 45% MAG COAT2.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start91.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"144.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"165.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"195.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"243.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"295.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"312 ft. MGO - General Observation - ROACHES @ MH312.3 ft. AMH - Downstream Manhole, Survey Ends - 05 1477312.3 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE312.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish312.3 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN312.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
2MGO45% MAG COAT
243.9TFC
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
0MWM
295.5TFC
2.9SSS
144.7TFC
312.3AMH05 1477
312.3MGOCONN @ MH 9 O'CLOCK/ACTIVE
0MGOROACHES @ MH
165.8TFC
195.1TFC
312.3SAP
0MWL
312.3MGOCONN @ MH 3 O'CLOCK/UNKNOWN
0AMH05 1478
312.3SSS
312MGOROACHES @ MH
2.9SAP
91.9TFC

Properties (7)

additional_info
SC411379
custom_field_three
AGGREGATE PROJECTING/ SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2020-06-09T02:26:28-07:00
documentation
PROPIPE
is_lateral_inspection
false