Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 9, 2020, 09:59 AM
  • 05 1476_05 1475_06092020_032803.mp4

Date
06/09/2020
W/O
833689
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06700
Time
2:59 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7721
Sewer Name
EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_833689_TV05300_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
27 in.
Upstream MH
05 1476
Downstream MH
05 1475
Dir. of Survey
Downstream
Length Surveyed
319.6 ft.
Total Length
319.6 ft.
Structural Index
3
Structural Quick
3K2J
Structural Rating
300
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
300
Pipe schematic from manhole 05 1476 to 05 1475
MH: 05 1476MH: 05 1475downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 14760 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. MGO - General Observation - 30% MAG COAT11.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start28.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN32.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start79.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN128.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN152.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"179.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"255.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN274.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN319.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"319.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish319.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish319.6 ft. AMH - Downstream Manhole, Survey Ends - 05 1475 ZOOMED IN

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    32.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    319.2 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"

Observations (20)

DistanceCodeObservation
128.1TFOPEN
179.5TFC
319.6SAP
319.2TF
11.3SAP
79.8TFOPEN
0MGOCONN @ MH 9 O'CLOCK/CAPPED
0MWM
255.4TFOPEN
0AMH05 1476
28.2TFOPEN
32.9SSS
319.6SSS
0MGOROACHES @ MH
152.3TFC
2MGO30% MAG COAT
274.1TFOPEN
0MGOCONN @ MH 3 O'CLOCK/CAPPED
0MWL
319.6AMH05 1475 ZOOMED IN

Properties (7)

additional_info
SC411379
custom_field_three
AGGREGATE PROJECTING/ SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2020-06-09T02:59:09-07:00
documentation
PROPIPE
is_lateral_inspection
false