Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 10, 2020, 08:22 AM
  • 05 1472_05 1471_06102020_013209.mp4

Date
06/10/2020
W/O
833689
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06695
Time
1:22 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7722
Sewer Name
EL NIDO TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_833689_TV05300_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
27 in.
Upstream MH
05 1472
Downstream MH
05 1471
Dir. of Survey
Downstream
Length Surveyed
333.6 ft.
Total Length
333.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
330
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
330
Pipe schematic from manhole 05 1472 to 05 1471
MH: 05 1472MH: 05 1471downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 14720 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED0 ft. MGO - General Observation - ROACHES @ MH2 ft. MGO - General Observation - 70% MAG COAT2.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN72.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN149 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"223.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN228.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"295.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN333.6 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED333.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333.6 ft. AMH - Downstream Manhole, Survey Ends - 05 1471

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"

    228.7 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"

Observations (18)

DistanceCodeObservation
0MWL
223.4TFOPEN
333.6MGOCONN @ MH 3 O'CLOCK/CAPPED
2MGO70% MAG COAT
12.4TFOPEN
333.6SSS
333.6SAP
0AMH05 1472
0MWM
333.6AMH05 1471
2.4SSS
0MGOCONN @ MH 3 O'CLOCK/CAPPED
72.8TFOPEN
2.4SAP
0MGOROACHES @ MH
228.7TBA
295.4TFOPEN
149TFA

Properties (7)

additional_info
SC411380
custom_field_three
AGGREGATE PROJECTING/ SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2020-06-10T01:22:16-07:00
documentation
PROPIPE
is_lateral_inspection
false