Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 10, 2020, 08:32 AM
  • 05 1471_05 1470_06102020_014352.mp4

Date
06/10/2020
W/O
833689
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06694
Time
1:32 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7722
Sewer Name
EL NIDO TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_833689_TV05300_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
27 in.
Upstream MH
05 1471
Downstream MH
05 1470
Dir. of Survey
Downstream
Length Surveyed
327.6 ft.
Total Length
327.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
325
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
325
Pipe schematic from manhole 05 1471 to 05 1470
MH: 05 1471MH: 05 1470downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 14712.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN92.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN94.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"146.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"164.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN194 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN245.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN248.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"295.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN327.6 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE327.6 ft. AMH - Downstream Manhole, Survey Ends - 05 1470327.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
94.6TFC
327.6MGOCONN @ MH 3 O'CLOCK/ACTIVE
0MWL
245.3TFOPEN
248.8TFA
0MGOCONN @ MH 3 O'CLOCK/CAPPED
327.6AMH05 1470
194TFOPEN
92.2TFOPEN
295.5TFOPEN
146.7TFC
0MWM
327.6SAP
164.7TFOPEN
2.9SSS
2.9SAP
37.3TFOPEN
327.6SSS
0AMH05 1471

Properties (7)

additional_info
SC411380
custom_field_three
AGGREGATE PROJECTING/ SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2020-06-10T01:32:21-07:00
documentation
PROPIPE
is_lateral_inspection
false