Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 10, 2020, 05:41 AM
  • 05 1469A_05 1469 _06092020_225138.mp4

Date
06/09/2020
W/O
833689
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06692
Time
10:41 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7722
Sewer Name
EL NIDO TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_833689_TV05300_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
12 in.
Upstream MH
05 1469A
Downstream MH
05 1469
Dir. of Survey
Downstream
Length Surveyed
145.8 ft.
Total Length
145.8 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 1469A to 05 1469
MH: 05 1469AMH: 05 1469downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 1469A0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.4 ft. MGO - General Observation - 65% MAG COAT17.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"65.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"117.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN145.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish145.8 ft. AMH - Downstream Manhole, Survey Ends - 05 1469145.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish145.8 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK/CAPPED

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0AMH05 1469A
0MGOCONN @ MH 9 O'CLOCK/UNKNOWN
0MWM
2.4MGO65% MAG COAT
0MWL
145.8SAP
17.5TFC
117.4TFOPEN
145.8AMH05 1469
2.1SSS
145.8SSS
2.1SAP
65.5TFC
145.8MGOCONNECTION AT MH 3 O'CLOCK/CAPPED

Properties (7)

additional_info
SC411380
custom_field_three
AGGREGATE PROJECTING/ SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2020-06-09T22:41:33-07:00
documentation
PROPIPE
is_lateral_inspection
false