Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 10, 2020, 07:08 AM
  • 05 1466_05 1465 _06102020_002026.mp4

Date
06/10/2020
W/O
833689
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06688
Time
12:08 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7722
Sewer Name
EL NIDO TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_833689_TV05300_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
27 in.
Upstream MH
05 1466
Downstream MH
05 1465
Dir. of Survey
Downstream
Length Surveyed
320.1 ft.
Total Length
320.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 1466 to 05 1465
MH: 05 1466MH: 05 1465downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 14660 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/OPEN0 ft. MWM - Water Mark, 25 %of cross sectional area2.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.8 ft. MGO - General Observation - 70% MAG COAT2.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"61.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"121.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"161.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"170.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"220.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"271.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"319.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish319.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish319.2 ft. MGO - General Observation - CONN @ MH 7 O'CLOCK/ACTIVE320.2 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE320.2 ft. AMH - Downstream Manhole, Survey Ends - 05 1465320.2 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
61.7TFC
320.2MGOCONN @ MH 3 O'CLOCK/ACTIVE
319.2SAP
319.2SSS
320.2AMH05 1465
320.2MGOCONN @ MH 9 O'CLOCK/CAPPED
170.6TFC
2.8SSS
2.8MGO70% MAG COAT
0AMH05 1466
161.3TFC
0MWL
22TFC
271.5TFC
0MGOCONN @ MH 3 O'CLOCK/OPEN
2.8SAP
0MWM
220.6TFC
319.2MGOCONN @ MH 7 O'CLOCK/ACTIVE
121.1TFC

Properties (7)

additional_info
SC411380
custom_field_three
AGGREGATE PROJECTING/ SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2020-06-10T00:08:55-07:00
documentation
PROPIPE
is_lateral_inspection
false