Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 4, 2020, 05:21 PM
  • H 0296_H 0295_08042020_Manual2.mp4

Date
08/04/2020
W/O
0838913
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00174
PipeID
P10751
Time
10:21 AM
Certificate
U-415-06024039
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0339
Sewer Name
JOINT OUTFALL H - UNIT 3
City
PICO RIVERA
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
21
Purpose
Capital Improvement Program Assesment
Project
20200804DF_JOINT_OUTFALL_H_UNIT_3
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Upstream MH
H 0295
Downstream MH
H 0296
Dir. of Survey
Upstream
Length Surveyed
2.1 ft.
Total Length
9.6 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole H 0295 to H 0296
MH: H 0295MH: H 0296upstream0 ft. MSA - Survey Abandoned - 10:28 AM0.2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES0.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES0.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES0.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES2.1 ft. MWM - Water Mark, 0 %of cross sectional area2.1 ft. MWL - Water Level, 0 %of cross sectional area2.1 ft. AMH - Downstream Manhole, Survey Begins - 10:22 AM

Observations (8)

DistanceCodeObservation
1.9SRV
1.9SAP
0MWM
1.9SSS
2.1MSA10:28 AM
0MWL
0AMH10:22 AM
1.9DAGS

Properties (6)

custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2020-08-04T10:21:57-07:00
documentation
FRANKLIN, CASTILLO, IGNACIO
is_lateral_inspection
false