Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 4, 2016, 10:54 AM
  • 14 0514A_14 0514_04012016_025445.mp4

Date
01/04/2016
W/O
541692
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00579
PipeID
P18606
Time
2:54 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3064
Sewer Name
14 TRUNK "C"
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
09
Purpose
Routine Assessment
Project
WO_541692_TV14020_DEC2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
14 0514A
Downstream MH
14 0514
Dir. of Survey
Downstream
Length Surveyed
230 ft.
Total Length
230 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
4131
O&M Rating
101
Overall Index
2
Overall Quick
Overall Rating
101
Pipe schematic from manhole 14 0514A to 14 0514
MH: 14 0514AMH: 14 0514downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 0514A0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start11.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"36.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"60.7 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES62.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"87.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"112.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"137.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"163.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"188.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"206.4 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"227.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish227.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish230 ft. AMH - Downstream Manhole, Survey Ends - 14 0514

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 20 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    60.7 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
11.5TFC
112.8TFC
188.7TFC
206.4TBA
0AMH14 0514A
163.3TFC
2DAGS
60.7DAGS
62.3TFA
227.7DAE
137.7TFC
230AMH14 0514
87.1TFC
227.7DAGS
0MWL
2DAE
36.5TFC
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MWM

Properties (6)

additional_info
SC224849
custom_field_two
4
customer
LACSD
datetime
2016-01-04T02:54:28-08:00
documentation
PRO PIPE
is_lateral_inspection
false