Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 31, 2015, 08:24 AM
  • 14 0523_14 0522A_31122015_002530.mp4

Date
12/31/2015
W/O
541692
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00579
PipeID
P18615
Time
12:24 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3063
Sewer Name
14 TRUNK "C"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
09
Purpose
Routine Assessment
Project
WO_541692_TV14020_DEC2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
14 0523
Downstream MH
14 0522A
Dir. of Survey
Downstream
Length Surveyed
189.9 ft.
Total Length
189.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2N00
O&M Rating
152
Overall Index
2
Overall Quick
Overall Rating
152
Pipe schematic from manhole 14 0523 to 14 0522A
MH: 14 0523MH: 14 0522Adownstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 05230 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start23.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"49.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"74.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"99.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"124.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"133 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start149.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"174.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"180.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish187.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish187.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish189.9 ft. AMH - Downstream Manhole, Survey Ends - 14 0522A189.9 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK189.9 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK189.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (3)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    133 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
2DAE
189.9AMH14 0522A
2DAGS
174.8TFC
189.9MGOACTIVE CONNECTION AT MH 9 O'CLOCK
133DSZ
23.8TFC
74.2TFC
0MWL
0AMH14 0523
149.6TFC
187.4DAGS
0MWM
180.7DSZ
189.9MGOACTIVE CONNECTION AT MH 3 O'CLOCK
187.4DAE
189.9MGOCOCKROACHES IN MANHOLE
124.5TFC
49.1TFC
99.9TFC

Properties (6)

additional_info
SC224848
custom_field_two
4
customer
LACSD
datetime
2015-12-31T00:24:58-08:00
documentation
PRO PIPE
is_lateral_inspection
false