Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 4, 2015, 11:17 AM
  • 22 0750_22 0749_20151204_033232.mp4

Date
12/04/2015
W/O
536652
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00821
PipeID
P17107
Time
3:17 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2878
Sewer Name
22 PUDDINGSTONE TRUNK, SECTS 1&2
City
SAN DIMAS, CA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
23
Purpose
Routine Assessment
Project
WO_536652_TV22057_NOV2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0749
Downstream MH
22 0750
Dir. of Survey
Upstream
Length Surveyed
349 ft.
Total Length
349 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
207
O&M Index
2
O&M Quick
2212
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
213
Pipe schematic from manhole 22 0749 to 22 0750
MH: 22 0749MH: 22 0750upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 07501.3 ft. MGO - General Observation - MAGNESIUM H.O. FINISH2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish22 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"99.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"147.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"191.3 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish196 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"248.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"269.3 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start299.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"340.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"345.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start347 ft. MGO - General Observation - MAGNESIUM H.O. START 80%347 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start349 ft. MWM - Water Mark, 35 %of cross sectional area349 ft. AMH - Downstream Manhole, Survey Begins - 22 0749349 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
0MWM
0AMH22 0749
153TFC
100.9TFC
2MGOMAGNESIUM H.O. START 80%
347.7MGOMAGNESIUM H.O. FINISH
2SAV
347SAV
249.7TFC
327TFC
346.6DAGS
0MWL
3.2DAGS
8.6TFA
157.7RFJ
201.1TFC
49.4TFC
349AMH22 0750
79.7RFJ

Properties (6)

additional_info
SC205646
custom_field_two
3
customer
LACSD
datetime
2015-12-04T03:17:00-08:00
documentation
PRO-PIPE
is_lateral_inspection
false