Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 4, 2015, 07:45 AM
  • 22 0753_22 0752_20151203_235836.mp4

Date
12/03/2015
W/O
536652
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00821
PipeID
P17110
Time
11:45 PM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2878
Sewer Name
22 PUDDINGSTONE TRUNK, SECTS 1&2
City
SAN DIMAS, CA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
23
Purpose
Routine Assessment
Project
WO_536652_TV22057_NOV2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0753
Downstream MH
22 0752
Dir. of Survey
Downstream
Length Surveyed
351.3 ft.
Total Length
351.3 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
207
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
211
Pipe schematic from manhole 22 0753 to 22 0752
MH: 22 0753MH: 22 0752downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 07532 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAGNESIUM H.O. START 20%2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start47.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"100.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"148.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"200.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"249 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"348 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish348.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish348.5 ft. MGO - General Observation - MAGNESIUM H.O. FINISH351.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0752

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
348.5DAGS
0MWL
148.4TFC
249TFC
2SAV
47.9TFC
2.1DAGS
2MGOMAGNESIUM H.O. START 20%
100.2TFC
348SAV
348.5MGOMAGNESIUM H.O. FINISH
200.4TFA
0MWM
0AMH22 0753
351.3AMH22 0752

Properties (6)

additional_info
SC205646
custom_field_two
3
customer
LACSD
datetime
2015-12-03T23:45:00-08:00
documentation
PRO-PIPE
is_lateral_inspection
false