Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 8, 2015, 07:22 AM
  • 30 0373_30 0131_20151208_005923_.mp4

Date
12/07/2015
W/O
536532
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00878
PipeID
P17837
Time
11:22 PM
Certificate
12345
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
k2959
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
07
Purpose
Routine Assessment
Project
WO_536532_TV30036_NOV2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Other
Height
18 in.
Upstream MH
30 0373
Downstream MH
30 0131
Dir. of Survey
Downstream
Length Surveyed
362.7 ft.
Total Length
362.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
3L11
O&M Rating
202
Overall Index
3
Overall Quick
Overall Rating
202
Pipe schematic from manhole 30 0373 to 30 0131
MH: 30 0373MH: 30 0131downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 30 03731.2 ft. MGO - General Observation - CONNECTION AT MANHOLE 9 O'CLOCK27.5 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start57.8 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 6"67.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"76.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"94 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 6"97.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"106.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"127.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"127.4 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 6"136.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"142.1 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 6"157.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"168.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"186.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"198.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"216.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"227.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"248.9 ft. RFL - Roots Fine Lateral, at 02 o'clock248.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"258 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6"288.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"294.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"321.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6"328.2 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 6"332.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"362.4 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish362.7 ft. AMH - Downstream Manhole, Survey Ends - 30 0131362.7 ft. MGO - General Observation - CONNECTION AT MANHOLE 3 O'CLOCK

Observations (32)

DistanceCodeObservation
157.3TFC
362.7AMH30 0131
27.5DAGS
57.8TB
216.4TFC
248.9RFL
168.1TF
321.4TF
0MWM
227.8TFC
94TB
106.2TFC
248.9TF
198.5TFC
332.9TFC
1.2MGOCONNECTION AT MANHOLE 9 O'CLOCK
136.1TFC
294.3TFC
76.8TF
97.5TFC
328.2TB
67.8TF
127.4TFC
362.4DAGS
288.1TFC
142.1TB
127.4TB
0MWL
186.4TF
258TF
0AMH30 0373
362.7MGOCONNECTION AT MANHOLE 3 O'CLOCK

Properties (6)

additional_info
SC205556
custom_field_two
4
customer
LACSD
datetime
2015-12-07T23:22:54-08:00
documentation
PRO PIPE
is_lateral_inspection
false