Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 26, 2015, 07:11 PM
  • 30 0328_30 0327_20160209_093555_.mp4

Date
10/26/2015
W/O
B140721
Weather
Dry
Operator/Surveyor
N.ZADREDDINE
Sewer ID
Z00878
PipeID
P18001
Time
12:11 PM
Certificate
N/A
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3177
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
REDONDO BEACH
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
05
Purpose
Routine Assessment
Project
WO_536532_TV30036_NOV2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Other
Height
24 in.
Upstream MH
30 0328
Downstream MH
30 0327
Dir. of Survey
Downstream
Length Surveyed
200.7 ft.
Total Length
200.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
1
O&M Quick
1300
O&M Rating
3
Overall Index
1
Overall Quick
Overall Rating
3
Pipe schematic from manhole 30 0328 to 30 0327
MH: 30 0328MH: 30 0327downstream0 ft. AMH - Upstream Manhole, Survey Begins - 30 03280 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area8.8 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish75.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"149.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"164.6 ft. LL - Alignment Left, 5 %200.6 ft. AMH - Downstream Manhole, Survey Ends - 03 0327200.7 ft. MGO - General Observation - service lateral at 12o clock at MH

Observations (10)

DistanceCodeObservation
0AMH30 0328
0RFJ
0MWM
75.5TF
0MWL
200.7MGOservice lateral at 12o clock at MH
164.6LL
200.6AMH03 0327
149.8TF
8.8RFJ

Properties (6)

additional_info
SC224991
custom_field_two
4
customer
LACSD
datetime
2015-10-26T12:11:26-07:00
documentation
PROPIPE
is_lateral_inspection
false