Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 1, 2020, 11:07 AM
  • B 1213_B 1212_06152020_041502.mp4

Date
06/01/2020
W/O
833527
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01125
PipeID
P13533
Time
4:07 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7696
Sewer Name
JOINT OUTFALL B - UNIT 6H
City
SOUTH PASADENA
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
16
Purpose
Routine Assessment
Project
WO_833527_TV16042_JUN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
B 1213
Downstream MH
B 1212
Dir. of Survey
Downstream
Length Surveyed
118.3 ft.
Total Length
118.3 ft.
Structural Index
3
Structural Quick
3D00
Structural Rating
69
O&M Index
2
O&M Quick
412H
O&M Rating
90
Overall Index
2
Overall Quick
Overall Rating
159
Pipe schematic from manhole B 1213 to B 1212
MH: B 1213MH: B 1212downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 65 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 12132 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start15.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS115.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish115.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish115.1 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish118.3 ft. AMH - Downstream Manhole, Survey Ends - B 1212

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
2DAGS
0MWL
15.7DSZDEBRIS
115.1SAP
118.3AMHB 1212
0MWM
2SAP
115.1DAGS
0AMHB 1213
115.1DSZ

Properties (7)

additional_info
SC411288
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
3
customer
1
datetime
2020-06-01T04:07:07-07:00
documentation
PRO PIPE
is_lateral_inspection
false