Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 18, 2020, 08:28 AM
  • B 1212_B 1211_06182020_014143.mp4

Date
06/18/2020
W/O
833527
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01125
PipeID
P13532
Time
1:28 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7852
Sewer Name
JOINT OUTFALL B - UNIT 6H
City
SOUTH PASADENA
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
16
Purpose
Routine Assessment
Project
WO_833527_TV16042_JUN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
B 1212
Downstream MH
B 1211
Dir. of Survey
Downstream
Length Surveyed
229.3 ft.
Total Length
229.3 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
2
O&M Quick
4132
O&M Rating
22
Overall Index
2
Overall Quick
Overall Rating
32
Pipe schematic from manhole B 1212 to B 1211
MH: B 1212MH: B 1211downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 12122 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS UNDER WATER2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start4.1 ft. MGO - General Observation - MAG COATING THROUGHOUT54.2 ft. RFB - Roots Fine Barrell, from 09 to 03 o'clock, within 8 inches of joint: YES, Start74.1 ft. RFB - Roots Fine Barrell, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish227.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish227.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish227.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish227.5 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK227.5 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish229.3 ft. AMH - Downstream Manhole, Survey Ends - B 1211

Observation photos (5)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS UNDER WATER

    2 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS UNDER WATER

  • General Observation - MAG COATING THROUGHOUT

    4.1 ft. - General Observation - MAG COATING THROUGHOUT

  • Roots Fine Barrell, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    54.2 ft. - Roots Fine Barrell, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
2SAP
227.5SAP
2DAGS
74.1RFB
0MWL
2DSZDEBRIS UNDER WATER
0MWM
227.5DAGS
227.5SSS
2SSS
4.1MGOMAG COATING THROUGHOUT
229.3AMHB 1211
227.5MGOCONNECTION AT MH 9 O'CLOCK
0AMHB 1212
54.2RFB
227.5DSZ

Properties (7)

additional_info
SC411293
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-06-18T01:28:46-07:00
documentation
PRO PIPE
is_lateral_inspection
false