Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 1, 2020, 08:41 AM
  • B 1208_B 1207_06012020_015501.mp4

Date
06/01/2020
W/O
833527
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01125
PipeID
P13528
Time
1:41 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7680
Sewer Name
JOINT OUTFALL B - UNIT 6H
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
16
Purpose
Routine Assessment
Project
WO_833527_TV16042_JUN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
B 1208
Downstream MH
B 1207
Dir. of Survey
Downstream
Length Surveyed
207.4 ft.
Total Length
207.4 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
123
O&M Index
2
O&M Quick
412G
O&M Rating
86
Overall Index
3
Overall Quick
Overall Rating
209
Pipe schematic from manhole B 1208 to B 1207
MH: B 1208MH: B 1207downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 12080 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, at 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start10.6 ft. MGO - General Observation - MAG COATING THROUGHOUT205.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish205.4 ft. SAP - Surface Aggregate Projecting, at 03 o'clock, within 8 inches of joint: YES, Finish207.4 ft. AMH - Downstream Manhole, Survey Ends - B 1207

Observation photos (3)

  • Surface Aggregate Projecting, at 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, at 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    10.6 ft. - General Observation - MAG COATING THROUGHOUT

Observations (9)

DistanceCodeObservation
205.4DAGS
0AMHB 1208
205.4SAP
207.4AMHB 1207
2SAP
0MWL
0MWM
10.6MGOMAG COATING THROUGHOUT
2DAGS

Properties (7)

additional_info
SC411272
custom_field_three
Aggregate Projecting
custom_field_two
3
customer
1
datetime
2020-06-01T01:41:59-07:00
documentation
PRO PIPE
is_lateral_inspection
false