Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 19, 2020, 06:47 AM
  • B 0408_B 0407_06182020_235756.mp4

Date
06/18/2020
W/O
833684
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00092
PipeID
P08920
Time
11:47 PM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7855
Sewer Name
JOINT OUTFALL B - UNIT 5B
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_833684_TV15053_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
57 in.
Upstream MH
B 0408
Downstream MH
B 0407
Dir. of Survey
Downstream
Length Surveyed
243.6 ft.
Total Length
243.6 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
240
O&M Index
2
O&M Quick
412I
O&M Rating
100
Overall Index
2
Overall Quick
Overall Rating
340
Pipe schematic from manhole B 0408 to B 0407
MH: B 0408MH: B 0407downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 04080 ft. MWL - Water Level, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start92.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"101.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"157.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"221.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"242 ft. MGO - General Observation - COCKROACHES IN MANHOLE242 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish242 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish242 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish243.6 ft. AMH - Downstream Manhole, Survey Ends - B 0407243.6 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    242 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
242MGOCOCKROACHES IN MANHOLE
0MGOCOCKROACHES IN MANHOLE
92.7TF
243.6AMHB 0407
243.6MGOCONNECTION AT MH 3 O'CLOCK
242SSS
242DAGS
0MWM
2DAGS
2SSS
0AMHB 0408
0MWL
157.3TFC
221.2TFC
101.2TF
2SAV
242SAV

Properties (7)

additional_info
SC411296
custom_field_three
LIGHT SPALLING/VISIBLE AGGREGATE
custom_field_two
3
customer
1
datetime
2020-06-18T23:47:15-07:00
documentation
PRO PIPE
is_lateral_inspection
false