Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 12, 2020, 06:45 AM
  • 19 0217_19 0216B_06112020_235318.mp4

Date
06/11/2020
W/O
833528
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00718
PipeID
P26795
Time
11:45 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7728
Sewer Name
ARTESIA-CERRITOS TRUNK
City
artesia
Loc. details
Light Highway
Location Code
C
District
District 19
Page No.
04
Purpose
Routine Assessment
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Other
Height
12 in.
Upstream MH
19 0217
Downstream MH
19 0216B
Dir. of Survey
Downstream
Length Surveyed
101.7 ft.
Total Length
101.7 ft.
Structural Index
3
Structural Quick
443B
Structural Rating
99
O&M Index
2
O&M Quick
2G00
O&M Rating
76
Overall Index
2
Overall Quick
Overall Rating
175
Pipe schematic from manhole 19 0217 to 19 0216B
MH: 19 0217MH: 19 0216Bdownstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 19 02170 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start19.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"24.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish82.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN99 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish99 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish99.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Finish99.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish101.7 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE101.7 ft. AMH - Downstream Manhole, Survey Ends - 19 0216B

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: YES, Start

    5.7 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
82.6TFOPEN
19.4TFC
99SSS
4.7FM
0MWM
24.7FM
2DAGS
99.2DAE
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
101.7MGOCONN @ MH 3 O'CLOCK/ACTIVE
101.7AMH19 0216B
2CM
0AMH19 0217
2SSS
0MGOROACHES @ MH
5.7DAE
0MWL
99.2CM
99DAGS

Properties (7)

additional_info
SC411386
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-06-11T23:45:36-07:00
documentation
PROPIPE
is_lateral_inspection
false