Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 12, 2020, 07:10 AM
  • 19 0215_19 0214_06122020_002126.mp4

Date
06/12/2020
W/O
833528
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00718
PipeID
P15184
Time
12:10 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7728
Sewer Name
ARTESIA-CERRITOS TRUNK
City
artesia
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_833528_TV19060_JUN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
19 0215
Downstream MH
19 0214
Dir. of Survey
Downstream
Length Surveyed
246.9 ft.
Total Length
247 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
240
O&M Index
2
O&M Quick
2R00
O&M Rating
190
Overall Index
2
Overall Quick
Overall Rating
430
Pipe schematic from manhole 19 0215 to 19 0214
MH: 19 0215MH: 19 0214downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 19 0215 ABANDONED MH0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start52 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"70.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"81.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN100 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"146.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN149.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"151.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN202.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"243.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish243.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish244 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish244 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish247 ft. AMH - Downstream Manhole, Survey Ends - 19 0214247 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
2CM
0MWM
70.5TFC
81.3TFOPEN
0AMH19 0215 ABANDONED MH
2DAGS
52TFC
244DAGS
149.1TFC
243.7DAE
100TFC
151.7TFOPEN
2SSS
0MWL
202.7TFC
146.5TFOPEN
10.7DAE
247AMH19 0214
244SSS
247MGOCONN @ MH 9 O'CLOCK/ACTIVE
243.7CM

Properties (7)

additional_info
SC411386
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-06-12T00:10:42-07:00
documentation
PROPIPE
is_lateral_inspection
false