Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 5, 2020, 05:42 AM
  • 01 0553_01 0552_06042020_230621.mp4

Date
06/04/2020
W/O
833505
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00206
PipeID
P01042
Time
10:42 PM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7687
Sewer Name
CROCKETT BOULEVARD-GLEN AVENUE TRUNK
City
FLORENCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_833505_TV01243_JUN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
12 in.
Upstream MH
01 0553
Downstream MH
01 0552
Dir. of Survey
Downstream
Length Surveyed
308.9 ft.
Total Length
308.9 ft.
Structural Index
3
Structural Quick
4K3K
Structural Rating
549
O&M Index
2
O&M Quick
412K
O&M Rating
126
Overall Index
3
Overall Quick
Overall Rating
675
Pipe schematic from manhole 01 0553 to 01 0552
MH: 01 0553MH: 01 0552downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 05530 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start23.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN60 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN90 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"102.6 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6" - OPEN141 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"158.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"213.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN267.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"270 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"306 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish306 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish306.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish307 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish308.9 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/308.9 ft. AMH - Downstream Manhole, Survey Ends - 01 0552308.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (3)

  • General Observation - ROACHES @ MANHOLE

    0 ft. - General Observation - ROACHES @ MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    308.9 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (25)

DistanceCodeObservation
141TFC
102.6TBOPEN
308.9MGOCONN @ MH 9 O'CLOCK/
2DAGS
4FM
0AMH01 0553
306SSS
306.9FM
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
213.1TFOPEN
0MWL
308.9AMH01 0552
0MWM
307DAGS
306CM
267.6TFC
158.7TFC
2SSS
90TFA
0MGOROACHES @ MANHOLE
2CM
308.9MGOCOCKROACHES IN MANHOLE
23.8TBOPEN
270TFC
60TBOPEN

Properties (7)

additional_info
SC411279
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2020-06-04T22:42:44-07:00
documentation
PRO PIPE
is_lateral_inspection
false