Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 5, 2020, 07:38 AM
  • 01 0549_01 0548_06052020_005556.mp4

Date
06/05/2020
W/O
833505
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00206
PipeID
P01038
Time
12:38 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7687
Sewer Name
CROCKETT BOULEVARD-GLEN AVENUE TRUNK
City
FLORENCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_833505_TV01243_JUN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
15 in.
Upstream MH
01 0549
Downstream MH
01 0548
Dir. of Survey
Downstream
Length Surveyed
318.1 ft.
Total Length
318.1 ft.
Structural Index
3
Structural Quick
4K2L
Structural Rating
374
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
3
Overall Quick
Overall Rating
500
Pipe schematic from manhole 01 0549 to 01 0548
MH: 01 0549MH: 01 0548downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/OPEN0 ft. AMH - Upstream Manhole, Survey Begins - 01 05490 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MANHOLE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"32.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN58.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN94.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"100.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"119.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN156.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN159.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6" - OPEN209.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6" - OPEN242 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6" - OPEN268.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"309.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"312 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"315.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish316 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish316 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish318.1 ft. AMH - Downstream Manhole, Survey Ends - 01 0548318.1 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/OPEN318.1 ft. MGO - General Observation - ROACHES @ MANHOLE318.1 ft. MGO - General Observation - CONN @ MH 4 O'CLOCK/OPEN

Observation photos (4)

  • General Observation - ROACHES @ MANHOLE

    0 ft. - General Observation - ROACHES @ MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MANHOLE

    318.1 ft. - General Observation - ROACHES @ MANHOLE

Observations (28)

DistanceCodeObservation
242TFOPEN
11TFA
268.1TFC
0MWM
312TFC
32.1TFOPEN
0MGOCONN @ MH 9 O'CLOCK/OPEN
100.2TFC
318.1AMH01 0548
119.8TFOPEN
58.8TFOPEN
318.1MGOCONN @ MH 9 O'CLOCK/OPEN
159.6TFOPEN
0AMH01 0549
156.8TFOPEN
316DAGS
309.3TFC
94.5TFC
209.5TFOPEN
2SSS
3.8FM
318.1MGOROACHES @ MANHOLE
0MWL
318.1MGOCONN @ MH 4 O'CLOCK/OPEN
316SSS
0MGOROACHES @ MANHOLE
2DAGS
315.9FM

Properties (7)

additional_info
SC411279
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2020-06-05T00:38:14-07:00
documentation
PRO PIPE
is_lateral_inspection
false