Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 28, 2020, 07:58 AM
  • 22 0673_22 0672_05282020_012007.mp4

Date
05/28/2020
W/O
828889
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00827
PipeID
P17023
Time
12:58 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7633
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_828889_TV22063_MAY2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0672
Downstream MH
22 0673
Dir. of Survey
Upstream
Length Surveyed
329.7 ft.
Total Length
329.7 ft.
Structural Index
3
Structural Quick
513L
Structural Rating
200
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
200
Pipe schematic from manhole 22 0672 to 22 0673
MH: 22 0672MH: 22 0673upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 0672A0 ft. MGO - General Observation - LINE RE ROUTED DUE TO NEW HOUSING0.6 ft. MGO - General Observation - UNMAPPED MH2.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish59.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"64.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"136.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"139.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"155.2 ft. RPP - Repair Patch, from 09 to 03 o'clock, within 8 inches of joint: YES - EXTERNAL155.2 ft. B - Broken, from 11 to 03 o'clock, within 8 inches of joint: YES - PATCHED212.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"217.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"289.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"294.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"326.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start329.7 ft. AMH - Downstream Manhole, Survey Begins - 22 0672329.7 ft. MWM - Water Mark, 15 %of cross sectional area329.7 ft. MWL - Water Level, 15 %of cross sectional area

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Repair Patch, from 09 to 03 o'clock, within 8 inches of joint: YES - EXTERNAL

    174.5 ft. - Repair Patch, from 09 to 03 o'clock, within 8 inches of joint: YES - EXTERNAL

  • Broken, from 11 to 03 o'clock, within 8 inches of joint: YES - PATCHED

    174.5 ft. - Broken, from 11 to 03 o'clock, within 8 inches of joint: YES - PATCHED

Observations (18)

DistanceCodeObservation
174.5RPPEXTERNAL
0AMH22 0672
265.4TFC
0MWM
329.7AMH22 0672A
329.7MGOLINE RE ROUTED DUE TO NEW HOUSING
189.9TFC
40.4TFC
117.2TFC
193.5TFC
329.1MGOUNMAPPED MH
3SAP
270.2TFC
174.5BPATCHED
0MWL
111.9TFC
327.5SAP
35.4TFC

Properties (6)

additional_info
SC411183
custom_field_two
2
customer
LACSD
datetime
2020-05-28T00:58:08-07:00
documentation
PROPIPE
is_lateral_inspection
false