Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 28, 2020, 06:13 AM
  • 22 0670_22 0669_05272020_233605.mp4

Date
05/27/2020
W/O
828889
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00827
PipeID
P17019
Time
11:13 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7633
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_828889_TV22063_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0670
Downstream MH
22 0669
Dir. of Survey
Downstream
Length Surveyed
395.7 ft.
Total Length
395.7 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
207
O&M Index
2
O&M Quick
2O1B
O&M Rating
170
Overall Index
2
Overall Quick
Overall Rating
377
Pipe schematic from manhole 22 0670 to 22 0669
MH: 22 0670MH: 22 0669downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06702.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start5.1 ft. LR - Alignment Right, 10 %, Start10.9 ft. MGO - General Observation - MAG COATING ATTATCHED35.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"36.8 ft. RPP - Repair Patch, from 09 to 10 o'clock, within 8 inches of joint: NO - HOLE51.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start52.8 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6"75.1 ft. LR - Alignment Right, 10 %, Finish104.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"109.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"186.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"191.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"268 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"273.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"344.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"349.4 ft. TFC - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"394.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish394.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish395.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0669

Observation photos (3)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Repair Patch, from 09 to 10 o'clock, within 8 inches of joint: NO - HOLE

    36.8 ft. - Repair Patch, from 09 to 10 o'clock, within 8 inches of joint: NO - HOLE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    51.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
10.9MGOMAG COATING ATTATCHED
344.4TFC
0MWL
349.4TFC
36.8RPPHOLE
394.3SAP
51.8SAP
394.3DAE
5.1LR
104.7TFC
0MWM
273.2TFC
109.7TFC
0AMH22 0670
75.1LR
186.7TFC
395.7AMH22 0669
35.3TFA
52.8TB
191.5TF
2.5DAE
268TFC

Properties (6)

additional_info
SC411183
custom_field_two
3
customer
LACSD
datetime
2020-05-27T23:13:53-07:00
documentation
PROPIPE
is_lateral_inspection
false