Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 1, 2020, 09:18 AM
  • 22 0666_22 0665_06012020_023152.mp4

Date
06/01/2020
W/O
828889
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00827
PipeID
P17015
Time
2:18 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7636
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_828889_TV22063_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Square
Height
15 in.
Width
15 in.
Upstream MH
22 0665
Downstream MH
22 0666
Dir. of Survey
Upstream
Length Surveyed
262.8 ft.
Total Length
262.8 ft.
Structural Index
3
Structural Quick
3I00
Structural Rating
144
O&M Index
2
O&M Quick
2I00
O&M Rating
102
Overall Index
2
Overall Quick
Overall Rating
246
Pipe schematic from manhole 22 0665 to 22 0666
MH: 22 0665MH: 22 0666upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 06661.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish74.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"79.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"150.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"156 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"221.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"227.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"243.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start258.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start258.5 ft. MGO - General Observation - MAG COATING ATTATCHED262.8 ft. MWM - Water Mark, 20 %of cross sectional area262.8 ft. MWL - Water Level, 15 %of cross sectional area262.8 ft. AMH - Downstream Manhole, Survey Begins - 22 0665

Observation photos (2)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    4.3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    19 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
106.8TFC
4.3DAE
0MWM
41.2TFC
262.8AMH22 0666
183.1TFC
0MWL
4.3MGOMAG COATING ATTATCHED
188.4TFC
261.4SAP
35.4TFC
112.1TFC
0AMH22 0665
261.4DAE
19SAP

Properties (6)

additional_info
SC411186
custom_field_two
3
customer
LACSD
datetime
2020-06-01T02:18:07-07:00
documentation
PROPIPE
is_lateral_inspection
false