Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 27, 2020, 10:35 AM
  • 22 0696_22 0695_04272020_034549.mp4

Date
04/27/2020
W/O
828889
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00827
PipeID
P17050
Time
3:35 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7620
Sewer Name
22 SUNFLOWER TRUNK
City
LA VERNE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
15
Purpose
Routine Assessment
Project
WO_828889_TV22063_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0695
Downstream MH
22 0696
Dir. of Survey
Upstream
Length Surveyed
121.5 ft.
Total Length
121.5 ft.
Structural Index
3
Structural Quick
3D00
Structural Rating
69
O&M Index
2
O&M Quick
2D00
O&M Rating
48
Overall Index
2
Overall Quick
Overall Rating
117
Pipe schematic from manhole 22 0695 to 22 0696
MH: 22 0695MH: 22 0696upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 06960.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish116 ft. MGO - General Observation - MAG COATING ATTATCHED116 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start116 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start121.5 ft. MWL - Water Level, 10 %of cross sectional area121.5 ft. MWM - Water Mark, 25 %of cross sectional area121.5 ft. MGO - General Observation - CONNECTION IN MH, 9 O' CLOCK121.5 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES - SLIME THROUGHOUT PIPE121.5 ft. AMH - Downstream Manhole, Survey Begins - 22 0695

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    5.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWL
120.6DAGS
0MWM
120.6SAP
121.5AMH22 0696
5.5MGOMAG COATING ATTATCHED
0MGOCONNECTION IN MH, 9 O' CLOCK
5.5DAGS
5.5SAP
0DAZSLIME THROUGHOUT PIPE
0AMH22 0695

Properties (6)

additional_info
SC411170
custom_field_two
3
customer
LACSD
datetime
2020-04-27T03:35:18-07:00
documentation
PROPIPE
is_lateral_inspection
false