Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 18, 2020, 09:39 AM
  • 22 0693_22 0692_05182020_025738.mp4

Date
05/18/2020
W/O
828889
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00827
PipeID
P17047
Time
2:39 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7630
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
15
Purpose
Routine Assessment
Project
WO_828889_TV22063_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0693
Downstream MH
22 0692
Dir. of Survey
Downstream
Length Surveyed
338.6 ft.
Total Length
338.6 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
2
O&M Quick
2600
O&M Rating
12
Overall Index
2
Overall Quick
Overall Rating
22
Pipe schematic from manhole 22 0693 to 22 0692
MH: 22 0693MH: 22 0692downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06932.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - MAG COAT DETERIORATING46 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - UNKNOWN CONNECTOIN, MISSED DURING THE INSPECTOIN52.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"98.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"103.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"149.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"175 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"180 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"236.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"241.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"245.6 ft. MGO - General Observation - MAG COATING ATTATCHED268.1 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start297.1 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish337.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish337.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish338.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0692

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - MAG COAT DETERIORATING

    11.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - MAG COAT DETERIORATING

  • Deposits Settled Compacted,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    268.1 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
175TFC
98.6TFC
338.6AMH22 0692
46TFUNKNOWN CONNECTOIN, MISSED DURING THE INSPECTOIN
245.6MGOMAG COATING ATTATCHED
0MWM
149.2TB
11.8SSSMAG COAT DETERIORATING
180TFC
337.4SAV
268.1DSC
236.5TFC
103.8TFC
0MWL
52.7TFC
241.7TFC
297.1DSC
2.1SAV
0AMH22 0693
337.4SSS

Properties (6)

additional_info
SC411190
custom_field_two
2
customer
LACSD
datetime
2020-05-18T02:39:00-07:00
documentation
PROPIPE
is_lateral_inspection
false