Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 18, 2020, 10:07 AM
  • 22 0691_22 0690_05182020_032253.mp4

Date
05/18/2020
W/O
828889
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00827
PipeID
P17045
Time
3:07 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7630
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
15
Purpose
Routine Assessment
Project
WO_828889_TV22063_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0691
Downstream MH
22 0690
Dir. of Survey
Downstream
Length Surveyed
269.4 ft.
Total Length
269.4 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
159
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
159
Pipe schematic from manhole 22 0691 to 22 0690
MH: 22 0691MH: 22 0690downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06910 ft. MWL - Water Level, 10 %of cross sectional area2.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"18.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"31.3 ft. MGO - General Observation - MAG COATING ATTATCHED95.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"100.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"171.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4", 4"177 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"248.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"253.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"267.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish269.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0690

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
171.7TFA
100.5TFC
267.1SAP
31.3MGOMAG COATING ATTATCHED
13.5TFC
18.9TFC
248.6TFC
269.4AMH22 0690
253.2TFC
2.6SAP
95.2TFC
0MWL
0AMH22 0691
177TFC
0MWL

Properties (6)

additional_info
SC411190
custom_field_two
3
customer
LACSD
datetime
2020-05-18T03:07:53-07:00
documentation
PROPIPE
is_lateral_inspection
false