Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 8, 2020, 06:47 AM
  • 20 0283_20 0282_07082020_000019.mp4

Date
07/07/2020
W/O
833502
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00751
PipeID
P19249
Time
11:47 PM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7869
Sewer Name
20TH STREET EAST RELIEF TRUNK
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_833502_TV20062_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0283
Downstream MH
20 0282
Dir. of Survey
Downstream
Length Surveyed
363.4 ft.
Total Length
363.4 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
216
O&M Index
2
O&M Quick
2M00
O&M Rating
144
Overall Index
3
Overall Quick
Overall Rating
360
Pipe schematic from manhole 20 0283 to 20 0282
MH: 20 0283MH: 20 0282downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 02830 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start17 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - UNKNOWN. DROVE PASS CONNECTION52 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"75.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"99.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"129.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"153.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"177.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"201.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"286.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"311.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"361.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish361.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish363.4 ft. AMH - Downstream Manhole, Survey Ends - 20 0282363.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - UNKNOWN. DROVE PASS CONNECTION

    17 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - UNKNOWN. DROVE PASS CONNECTION

Observations (19)

DistanceCodeObservation
361.7DAGS
2SAP
17TFUNKNOWN. DROVE PASS CONNECTION
99.6TFC
177.1TFC
201.9TFC
286.7TFA
363.4AMH20 0282
363.4MGOCONNECTION AT MH 3 O'CLOCK
75.6TFC
0AMH20 0283
2DAGS
153.2TFC
0MWL
52TFC
129.1TFC
0MWM
311.7TFC
361.7SAP

Properties (7)

additional_info
SC411708
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-07-07T23:47:59-07:00
documentation
PRO PIPE
is_lateral_inspection
false