Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 9, 2020, 08:22 AM
  • 22 0610_22 0609 _06092020_013937.mp4

Date
06/09/2020
W/O
828938
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00827
PipeID
P16957
Time
1:22 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7642
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
27
Purpose
Routine Assessment
Project
RFIR_WO_828938_TV22166_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0610
Downstream MH
22 0609
Dir. of Survey
Downstream
Length Surveyed
351.5 ft.
Total Length
351.5 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
345
O&M Index
2
O&M Quick
2M00
O&M Rating
138
Overall Index
2
Overall Quick
Overall Rating
483
Pipe schematic from manhole 22 0610 to 22 0609
MH: 22 0610MH: 22 0609downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - CONN @ MH 9 O' CLOCK/ACTIVE0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06103.1 ft. MGO - General Observation - 55% MAG COAT3.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.1 ft. DAE - Deposits Attached Encrustation, 0 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start5.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start41.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"69.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"93.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"101.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"139.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"152.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN155.9 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN187.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"216.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN240.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN245.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN269.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN289.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN318.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 4"334.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4"349.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish349.6 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish349.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish351 ft. MGO - General Observation - ROACHES @ MH351.5 ft. AMH - Downstream Manhole, Survey Ends - 22 0609

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 0 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    3.1 ft. - Deposits Attached Encrustation, 0 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (29)

DistanceCodeObservation
93.5TFC
187.2TFC
41.5TFC
216.7TFOPEN
139.4TFC
240.3TFOPEN
3.1MGO55% MAG COAT
3.1SAP
101.5TFC
349.6SSS
3.1DAE
0MGOROACHES @ MH
318.5TFA
5.4SSS
269.8TFOPEN
69.3TFC
351.5AMH22 0609
334.9TFA
349.6DAE
155.9TBOPEN
0MGOCONN @ MH 9 O' CLOCK/ACTIVE
0MWM
152.8TBOPEN
0MWL
289.6TFOPEN
0AMH22 0610
349.6SAP
245.7TBOPEN
351MGOROACHES @ MH

Properties (6)

additional_info
SC411602
custom_field_two
2
customer
LACSD
datetime
2020-06-09T01:22:00-07:00
documentation
PROPIPE
is_lateral_inspection
false