Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 4, 2020, 07:40 AM
  • 22 0638_22 0637 _06042020_005908.mp4

Date
06/04/2020
W/O
828938
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00827
PipeID
P16986
Time
12:40 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7639
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_828938_TV22166_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0638
Downstream MH
22 0637
Dir. of Survey
Downstream
Length Surveyed
108.7 ft.
Total Length
108.7 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
105
O&M Index
2
O&M Quick
312C
O&M Rating
47
Overall Index
2
Overall Quick
Overall Rating
152
Pipe schematic from manhole 22 0638 to 22 0637
MH: 22 0638MH: 22 0637downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 22 06380 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. MGO - General Observation - 50% MAG COAT2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"50.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN75.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"93.8 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES100.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"108.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish108.7 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - OBSTRUCTION108.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish108.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish108.7 ft. MSA - Survey Abandoned - OBSTRUCTION

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
108.7DAE
108.7DSZOBSTRUCTION
0MGOROACHES @ MH
0AMH22 0638
2.5SAP
108.7SAP
100.7TF
0MWL
22.3TFC
50.7TFOPEN
2.5DAE
75.4TFC
0MWM
2MGO50% MAG COAT
108.7SSS
93.8DSC
108.7MSAOBSTRUCTION
2.5SSS

Properties (6)

additional_info
SC411189
custom_field_two
2
customer
LACSD
datetime
2020-06-04T00:40:44-07:00
documentation
PROPIPE
is_lateral_inspection
false