Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 8, 2020, 10:32 AM
  • 22 0619_22 0618 _06082020_034611.mp4

Date
06/08/2020
W/O
828938
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00827
PipeID
P16967
Time
3:32 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7641
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_828938_TV22166_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0619
Downstream MH
22 0618
Dir. of Survey
Downstream
Length Surveyed
237.8 ft.
Total Length
237.8 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
228
O&M Index
2
O&M Quick
2H00
O&M Rating
92
Overall Index
2
Overall Quick
Overall Rating
320
Pipe schematic from manhole 22 0619 to 22 0618
MH: 22 0619MH: 22 0618downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 06190 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2.4 ft. MGO - General Observation - MAG COATING ATTATCHED, 65%2.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start6.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN17.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"62.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"111.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"123.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - ACTIVE136.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"160.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"210.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"234.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish234.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish234.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish237.8 ft. MGO - General Observation - CONNECTION IN MH, 9 O' CLOCK, ACTIVE237.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0618

Observation photos (3)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2.4 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
2.4MGOMAG COATING ATTATCHED, 65%
234.3DAE
2.4DAE
136.3TFC
210.8TFC
111.1TFC
62.2TFC
6.4SAP
0AMH22 0619
17.6TFC
237.8MGOCONNECTION IN MH, 9 O' CLOCK, ACTIVE
160.5TFC
234.3SSS
0MWL
13.6TFOPEN
8.3SSS
237.8AMH22 0618
234.3SAP
123.6TFACTIVE
0MWM

Properties (6)

additional_info
SC411191
custom_field_two
2
customer
LACSD
datetime
2020-06-08T03:32:28-07:00
documentation
PROPIPE
is_lateral_inspection
false