Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 1, 2020, 08:33 AM
  • 22 0665_22 0664_06012020_015744.mp4

Date
06/01/2020
W/O
828938
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00827
PipeID
P17014
Time
1:33 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7635
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_828938_TV22166_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0664
Downstream MH
22 0665
Dir. of Survey
Upstream
Length Surveyed
304.2 ft.
Total Length
304.2 ft.
Structural Index
3
Structural Quick
3I00
Structural Rating
144
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
144
Pipe schematic from manhole 22 0664 to 22 0665
MH: 22 0664MH: 22 0665upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 06651.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish24.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"29.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"89.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN92.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"191.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"197.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"242.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start242.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"299.7 ft. MGO - General Observation - MAG COATING ATTATCHED304.2 ft. MWL - Water Level, 10 %of cross sectional area304.2 ft. AMH - Downstream Manhole, Survey Begins - 22 0664304.2 ft. MGO - General Observation - ROACHES AT MH304.2 ft. MWM - Water Mark, 25 %of cross sectional area304.2 ft. MGO - General Observation - CONNECTION IN MH, 9 O' CLOCK, ACTIVE

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    61.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
107.1TFC
0MWL
302.5SAP
0AMH22 0664
279.9TFC
0MGOROACHES AT MH
112.4TFC
61.5SAP
61.5TF
211.3TFC
275TFC
0MWM
4.5MGOMAG COATING ATTATCHED
214.8TFOPEN
304.2AMH22 0665
0MGOCONNECTION IN MH, 9 O' CLOCK, ACTIVE

Properties (6)

additional_info
SC411185
custom_field_two
3
customer
LACSD
datetime
2020-06-01T01:33:16-07:00
documentation
PROPIPE
is_lateral_inspection
false