Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 3, 2020, 05:11 AM
  • 22 0648_22 0647 _06022020_222709.mp4

Date
06/02/2020
W/O
828938
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00827
PipeID
P16996
Time
10:11 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7638
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_828938_TV22166_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0648
Downstream MH
22 0647
Dir. of Survey
Downstream
Length Surveyed
119.1 ft.
Total Length
119.1 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
115
O&M Index
2
O&M Quick
2H00
O&M Rating
92
Overall Index
2
Overall Quick
Overall Rating
207
Pipe schematic from manhole 22 0648 to 22 0647
MH: 22 0648MH: 22 0647downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06480 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - 65% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start3.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start41 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"45.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"89.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"93.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"116.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish116.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish116.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish117 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish119 ft. MGO - General Observation - ROACHES @ MH119.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0647

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
116.8DAE
89.3TFC
119MGOROACHES @ MH
41TFC
3.3SSS
2.3SAP
0MWM
0AMH22 0648
93.7TFC
45.3TFC
2.3DAE
119.1AMH22 0647
117DAGS
2DAGS
116.8SSS
0MWL
0MGOROACHES @ MH
0MGO65% MAG COAT
116.8SAP

Properties (6)

additional_info
SC411188
custom_field_two
2
customer
LACSD
datetime
2020-06-02T22:11:05-07:00
documentation
PROPIPE
is_lateral_inspection
false