Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 10, 2020, 06:00 AM
  • 14 0641_14 0640_07092020_231537.mp4

Date
07/09/2020
W/O
833498
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00589
PipeID
P18733
Time
11:00 PM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7873
Sewer Name
55TH STREET WEST TRUNK
City
QUARTZ HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
25
Purpose
Routine Assessment
Project
WO_833498_TV14004_JUN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
14 0641
Downstream MH
14 0640
Dir. of Survey
Downstream
Length Surveyed
351.3 ft.
Total Length
351.3 ft.
Structural Index
2
Structural Quick
2M00
Structural Rating
138
O&M Index
2
O&M Quick
2M00
O&M Rating
140
Overall Index
2
Overall Quick
Overall Rating
278
Pipe schematic from manhole 14 0641 to 14 0640
MH: 14 0641MH: 14 0640downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 06410 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.9 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"75.3 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"83.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"156 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"164.1 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"232.1 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"234.4 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"254.1 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"298 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"302.6 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"305.4 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"349 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish349.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish351.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0640

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
75.3TFA
305.4TFC
6.9TFC
298TFC
0MWM
232.1TFA
349.7DAGS
83.2TFC
349SSS
302.6TBA
2SSS
156TFA
234.4TFC
351.3AMH14 0640
254.1TBA
164.1TFC
0AMH14 0641
0MWL
2DAGS

Properties (7)

additional_info
SC411712
custom_field_three
LIGHT GREASE
custom_field_two
4
customer
1
datetime
2020-07-09T23:00:40-07:00
documentation
PRO PIPE
is_lateral_inspection
false