Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 3, 2020, 05:15 AM
  • B 0455_B 0454A_06022020_222640.mp4

Date
06/02/2020
W/O
833619
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00093
PipeID
P08968
Time
10:15 PM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7683
Sewer Name
JOINT OUTFALL B - UNIT 5C
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_833619_TV16079_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
57 in.
Upstream MH
B 0455
Downstream MH
B 0454A
Dir. of Survey
Downstream
Length Surveyed
213.8 ft.
Total Length
213.8 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
210
O&M Index
2
O&M Quick
412G
O&M Rating
88
Overall Index
2
Overall Quick
Overall Rating
298
Pipe schematic from manhole B 0455 to B 0454A
MH: B 0455MH: B 0454Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - B 04550 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 80% MAG COATING THROUGHOUT43 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"51.5 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"99.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"104.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"165.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"168.9 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"211 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish211.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish211.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish213.8 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK213.8 ft. AMH - Downstream Manhole, Survey Ends - B 0454A213.8 ft. MGO - General Observation - ROACHES IN MANHOLE

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 80% MAG COATING THROUGHOUT

    2 ft. - General Observation - 80% MAG COATING THROUGHOUT

  • General Observation - ROACHES IN MANHOLE

    213.8 ft. - General Observation - ROACHES IN MANHOLE

Observations (19)

DistanceCodeObservation
213.8MGOCONN @ MH 9 O'CLOCK
213.8AMHB 0454A
2DAGS
0AMHB 0455
213.8MGOROACHES IN MANHOLE
211.8SAP
2SSS
51.5TBA
211SSS
168.9TBA
99.9TFC
43TFC
2SAP
0MWM
2MGO80% MAG COATING THROUGHOUT
0MWL
104.3TBA
211.8DAGS
165.2TFC

Properties (7)

additional_info
SC411275
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-06-02T22:15:53-07:00
documentation
PRO PIPE
is_lateral_inspection
false