Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 2, 2020, 10:11 AM
  • B 0453_B 0452_06022020_032644.mp4

Date
06/02/2020
W/O
833619
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00093
PipeID
P08965
Time
3:11 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7682
Sewer Name
JOINT OUTFALL B - UNIT 5C
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_833619_TV16079_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
57 in.
Upstream MH
B 0452
Downstream MH
B 0453
Dir. of Survey
Upstream
Length Surveyed
294.2 ft.
Total Length
294.2 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
290
O&M Index
2
O&M Quick
4132
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
418
Pipe schematic from manhole B 0452 to B 0453
MH: B 0452MH: B 0453upstream0 ft. AMH - Upstream Manhole, Survey Ends - B 04530 ft. MGO - General Observation - CONN @ MH 3 O' CLOCK/ACTIVE0.2 ft. MGO - General Observation - CONN @ MH 5 O' CLOCK/ACTIVE0.2 ft. MGO - General Observation - ROACHES @ MH1.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish2.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish88.6 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"150.1 ft. RMC - Roots Medium Connection, from 12 to 06 o'clock, 20 %, within 8 inches of joint: YES - 10% ROOTS-LATERAL150.1 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"153.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"221 ft. RMC - Roots Medium Connection, from 12 to 06 o'clock, 25 %, within 8 inches of joint: YES - 25% ROOTS-LATERAL221 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 6"281.1 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - 15% GREASE/OPEN284.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"292.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start292.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start292.2 ft. MGO - General Observation - 85% MAG COAT THROUGHOUT292.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start294.2 ft. MGO - General Observation - CONN @ MH 5 O'CLOCK/ACTIVE294.2 ft. MGO - General Observation - ROACHES @ MANHOLE294.2 ft. AMH - Downstream Manhole, Survey Begins - B 0452294.2 ft. MWM - Water Mark, 60 %of cross sectional area294.2 ft. MWL - Water Level, 25 %of cross sectional area294.2 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE294.2 ft. MGO - General Observation - CONN @ MH 5 O'CLOCK/ACTIVE

Observation photos (6)

  • General Observation - ROACHES @ MANHOLE

    0 ft. - General Observation - ROACHES @ MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 85% MAG COAT THROUGHOUT

    2 ft. - General Observation - 85% MAG COAT THROUGHOUT

  • Roots Medium Connection, from 12 to 06 o'clock, 25 %, within 8 inches of joint: YES - 25% ROOTS-LATERAL

    73.2 ft. - Roots Medium Connection, from 12 to 06 o'clock, 25 %, within 8 inches of joint: YES - 25% ROOTS-LATERAL

  • Roots Medium Connection, from 12 to 06 o'clock, 20 %, within 8 inches of joint: YES - 10% ROOTS-LATERAL

    144.1 ft. - Roots Medium Connection, from 12 to 06 o'clock, 20 %, within 8 inches of joint: YES - 10% ROOTS-LATERAL

Observations (26)

DistanceCodeObservation
292SSS
140.9TFC
0MGOCONN @ MH 5 O'CLOCK/ACTIVE
0MGOROACHES @ MANHOLE
13.1TFD15% GREASE/OPEN
294MGOCONN @ MH 5 O' CLOCK/ACTIVE
0AMHB 0452
0MWM
294.2AMHB 0453
73.2RMC25% ROOTS-LATERAL
2DAGS
0MWL
294.2MGOCONN @ MH 3 O' CLOCK/ACTIVE
294MGOROACHES @ MH
9.5TFC
144.1RMC10% ROOTS-LATERAL
2SAP
2MGO85% MAG COAT THROUGHOUT
2SSS
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
293.1SAP
293.1DAGS
205.6TFA
0MGOCONN @ MH 5 O'CLOCK/ACTIVE
73.2TFA
144.1TBA

Properties (7)

additional_info
SC411274
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-06-02T03:11:33-07:00
documentation
PRO PIPE
is_lateral_inspection
false