Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 2, 2020, 09:59 AM
  • B 0452_B 0451_06022020_031053.mp4

Date
06/02/2020
W/O
833619
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00093
PipeID
P08964
Time
2:59 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7682
Sewer Name
JOINT OUTFALL B - UNIT 5C
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_833619_TV16079_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
57 in.
Upstream MH
B 0451
Downstream MH
B 0452
Dir. of Survey
Upstream
Length Surveyed
230.1 ft.
Total Length
230.1 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
225
O&M Index
2
O&M Quick
412H
O&M Rating
94
Overall Index
2
Overall Quick
Overall Rating
319
Pipe schematic from manhole B 0451 to B 0452
MH: B 0451MH: B 0452upstream0 ft. MGO - General Observation - ROACHES @ MANHOLE0 ft. AMH - Upstream Manhole, Survey Ends - B 04520 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish49.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"51.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"107.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"110.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"184 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"186.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"193.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"219.6 ft. MGO - General Observation - 80% MAG COAT THROUGHOUT228.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start228.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start228.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start230.1 ft. MWM - Water Mark, 35 %of cross sectional area230.1 ft. MWL - Water Level, 30 %of cross sectional area230.1 ft. AMH - Downstream Manhole, Survey Begins - B 0451

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - 80% MAG COAT THROUGHOUT

    10.5 ft. - General Observation - 80% MAG COAT THROUGHOUT

  • General Observation - ROACHES @ MANHOLE

    230.1 ft. - General Observation - ROACHES @ MANHOLE

Observations (20)

DistanceCodeObservation
230.1MGOROACHES @ MANHOLE
2SAP
178.2TFC
181TFA
43.5TFC
122.7TFA
228SSS
0MWM
46.1TFC
230.1AMHB 0452
2DAGS
230.1MGOCONN @ MH 3 O'CLOCK/ACTIVE
228.1DAGS
0MWL
228.1SAP
119.6TFC
0AMHB 0451
10.5MGO80% MAG COAT THROUGHOUT
2SSS
36.5TFA

Properties (7)

additional_info
SC411274
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-06-02T02:59:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false