Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 11, 2020, 09:10 AM
  • 08 0179_08 0178_06112020_021830.mp4

Date
06/11/2020
W/O
833557
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00009
PipeID
P00237
Time
2:10 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7725
Sewer Name
GRACE STREET TRUNK, SECTION 1
City
CARSON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
WO_833557_TV08019_JUN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
18 in.
Upstream MH
08 0179
Downstream MH
08 0178
Dir. of Survey
Downstream
Length Surveyed
52.8 ft.
Total Length
52.8 ft.
Structural Index
4
Structural Quick
4A21
Structural Rating
42
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
42
Pipe schematic from manhole 08 0179 to 08 0178
MH: 08 0179MH: 08 0178downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 08 01794.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES52.8 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK52.8 ft. AMH - Downstream Manhole, Survey Ends - 08 017852.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
52.8MGOCONNECTION AT MH 9 O'CLOCK
0MWM
52.8AMH08 0178
0MWL
19CL
52.8FM
0MGOCONNECTION AT MH 9 O'CLOCK
0AMH08 0179
4.7FM

Properties (5)

additional_info
SC411383
customer
1
datetime
2020-06-11T02:10:58-07:00
documentation
PROPIPE
is_lateral_inspection
false