B 1277_B 1276_7162020_030335.mp4
2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE
2 ft. - General Observation - MAG COAT 60% START
38.1 ft. - General Observation - RUST STAINED CONCRETE
83.9 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK
94 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
130.9 ft. - General Observation - 75% MAG COAT START
| Distance | Code | Observation |
|---|---|---|
| 160.8 | AMH | 3:20AM |
| 160.5 | MGO | MAG COAT 75% FINISH |
| 53.8 | DSZ | ROCKS |
| 0 | AMH | 3:05AM |
| 38.1 | MGO | RUST STAINED CONCRETE |
| 2 | SAM | SEVERE AGG |
| 2 | SSS | BLISTERING CONCRETE |
| 160.5 | SAM | SEVERE AGG |
| 94 | SAM | SEVERE AGG |
| 0 | MWL | — |
| 0 | MWM | — |
| 130.9 | MGO | 75% MAG COAT START |
| 83.9 | DSZ | ROCK |
| 160.5 | SSS | BLISTERING CONCRETE |
| 102.2 | DSZ | ROCKS |
| 2 | MGO | MAG COAT 60% START |