Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 3, 2020, 09:51 AM
  • B 0465_B 0464_06152020_030702.mp4

Date
06/03/2020
W/O
833589
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00094
PipeID
P08978
Time
2:51 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7695
Sewer Name
JOINT OUTFALL B - UNIT 5D
City
PASADENA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_833589_TV16037_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
60 in.
Upstream MH
B 0464
Downstream MH
B 0465
Dir. of Survey
Upstream
Length Surveyed
395.2 ft.
Total Length
395.2 ft.
Structural Index
3
Structural Quick
3O2E
Structural Rating
292
O&M Index
2
O&M Quick
2O00
O&M Rating
156
Overall Index
2
Overall Quick
Overall Rating
448
Pipe schematic from manhole B 0464 to B 0465
MH: B 0464MH: B 0465upstream0 ft. AMH - Upstream Manhole, Survey Ends - B 04652.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish15.2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish100 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"162.2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start393.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start393.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start395.2 ft. MWL - Water Level, 25 %of cross sectional area395.2 ft. MWM - Water Mark, 35 %of cross sectional area395.2 ft. AMH - Downstream Manhole, Survey Begins - B 0464

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
295.2TBA
233SSS
0MWL
393DAGS
380SSS
395.2AMHB 0465
2SAP
0MWM
2DAGS
393SAP
0AMHB 0464

Properties (7)

additional_info
SC411287
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-06-03T02:51:20-07:00
documentation
PRO PIPE
is_lateral_inspection
false