Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 4, 2020, 05:17 AM
  • B 0463A_B 0463_06032020_223117.mp4

Date
06/03/2020
W/O
833589
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00094
PipeID
P08977
Time
10:17 PM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7686
Sewer Name
JOINT OUTFALL B - UNIT 5D
City
PASADENA
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_833589_TV16037_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
60 in.
Upstream MH
B 0463A
Downstream MH
B 0463
Dir. of Survey
Downstream
Length Surveyed
219.8 ft.
Total Length
219.8 ft.
Structural Index
3
Structural Quick
3H2G
Structural Rating
212
O&M Index
2
O&M Quick
2H12
O&M Rating
88
Overall Index
2
Overall Quick
Overall Rating
300
Pipe schematic from manhole B 0463A to B 0463
MH: B 0463AMH: B 0463downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 0463A0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start5.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES18.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start138.7 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR, Start154.5 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR, Finish217.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish217.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish217.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish219.8 ft. AMH - Downstream Manhole, Survey Ends - B 0463219.8 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    5.2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    18.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR, Start

    138.7 ft. - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR, Start

  • General Observation - COCKROACHES IN MANHOLE

    219.8 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (15)

DistanceCodeObservation
217.8DAGS
0MWM
0MWL
2SAP
219.8AMHB 0463
154.5RFJ
0AMHB 0463A
217.8SAP
18.2SSS
5.2CM
217.8SSS
219.8MGOCOCKROACHES IN MANHOLE
138.7RFJ
2DAGS
0MGOCONNECTION AT MH 3 O'CLOCK

Properties (7)

additional_info
SC411278
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-06-03T22:17:14-07:00
documentation
PRO PIPE
is_lateral_inspection
false