Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 17, 2020, 11:28 AM
  • 16 0274_16 0273_7172020_043128.mp4

Date
07/17/2020
W/O
0839269
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00652
PipeID
P13316
Time
4:28 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1487R
Sewer Name
16 CHAPEL AVENUE TRUNK, SECTION 1
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Maintenance Related
Project
20200717MDM_CHAPEL_AVENUE_TRUNK_SECTION_1
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
16 0274
Downstream MH
16 0273
Dir. of Survey
Downstream
Length Surveyed
249.8 ft.
Total Length
249.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
1
O&M Quick
2113
O&M Rating
5
Overall Index
1
Overall Quick
Overall Rating
5
Pipe schematic from manhole 16 0274 to 16 0273
MH: 16 0274MH: 16 0273downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:30AM0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWL - Water Level, 10 %of cross sectional area31.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped46.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped57.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped69.9 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open-30% ROOTS81.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped87.2 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR - 1%96.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped99.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open106.6 ft. RFJ - Roots Fine Joint, from 02 to 05 o'clock, within 8 inches of joint: YESR - 4%119.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped135.7 ft. RFJ - Roots Fine Joint, from 02 to 04 o'clock, within 8 inches of joint: YESR - 1%141 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped146.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open152.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Active159 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped170 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open182.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped193.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped208.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped220.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped232.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open249.1 ft. MGO - General Observation - 15% ROOTS IN MH249.4 ft. MGO - General Observation - MH CONN 9:00 ACTIVE249.8 ft. AMH - Downstream Manhole, Survey Ends - 4:55AM

Observations (28)

DistanceCodeObservation
46.2TFCCapped
182.1TFCCapped
152.5TBActive
220.8TFCCapped
193.8TFCCapped
249.1MGO15% ROOTS IN MH
146.7TFOpen
0AMH4:30AM
0MWM
159TFCCapped
96.6TFCCapped
57.9TFCCapped
135.7RFJ1%
141TFCCapped
249.8AMH4:55AM
69.9TFDOpen-30% ROOTS
87.2RFJ1%
0MGOMH CONN 9:00 ACTIVE
208.7TFCCapped
232.1TFOpen
106.6RFJ4%
119.8TFCCapped
31.5TFCCapped
0MWL
99.3TFOpen
170TFOpen
81.7TFCCapped
249.4MGOMH CONN 9:00 ACTIVE

Properties (5)

additional_info
ROOT EVALUATION ONLY
customer
LACSD
datetime
2020-07-17T04:28:36-07:00
documentation
MARTIN,OLIVER 111,SHADLER,BARR
is_lateral_inspection
false