Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 17, 2020, 10:40 AM
  • 16 0275_16 0274_7172020_035530.mp4

Date
07/17/2020
W/O
0839269
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00652
PipeID
P13317
Time
3:40 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1487R
Sewer Name
16 CHAPEL AVENUE TRUNK, SECTION 1
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Maintenance Related
Project
20200717MDM_CHAPEL_AVENUE_TRUNK_SECTION_1
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
16 0275
Downstream MH
16 0274
Dir. of Survey
Downstream
Length Surveyed
219.7 ft.
Total Length
219.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
5112
O&M Rating
7
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 16 0275 to 16 0274
MH: 16 0275MH: 16 0274downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:05AM33.9 ft. MWL - Water Level, 40 %of cross sectional area33.9 ft. MWM - Water Mark, 80 %of cross sectional area52.6 ft. MWM - Water Mark, 40 %of cross sectional area52.6 ft. MWL - Water Level, 10 %of cross sectional area86.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped98.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open113.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped124.8 ft. RFC - Roots Fine Connection, from 02 to 04 o'clock, within 8 inches of joint: YES - 2%124.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open136.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped148.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped163.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open163.4 ft. RFC - Roots Fine Connection, from 09 to 10 o'clock, within 8 inches of joint: YES - 1%175.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped190.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped202 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open219.2 ft. MGO - General Observation - MH CONN 9:00 ACTIVE219.7 ft. AMH - Downstream Manhole, Survey Ends - 4:25AM

Observations (21)

DistanceCodeObservation
219.7AMH4:25AM
0MWM
175.2TFCCapped
163.4TFOpen
86.2TFCCapped
148.2TFCCapped
0MWL
33.9MWL
124.8RFC2%
190.3TFCCapped
0AMH4:05AM
219.2MGOMH CONN 9:00 ACTIVE
52.6MWM
33.9MWM
136.3TFCCapped
52.6MWL
163.4RFC1%
124.9TFOpen
202TFOpen
113.3TFCCapped
98.3TFOpen

Properties (5)

additional_info
ROOT EVALUATION ONLY
customer
LACSD
datetime
2020-07-17T03:40:02-07:00
documentation
MARTIN,OLIVER 111,SHADLER,BARR
is_lateral_inspection
false