Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 24, 2020, 06:24 AM
  • 14 0267_14 0459_06232020_233229.mp4

Date
06/23/2020
W/O
833635
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00570
PipeID
P18548
Time
11:24 PM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7859
Sewer Name
AVENUE "I" TRUNK
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_833635_TV14079_JUN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0267
Downstream MH
14 0459
Dir. of Survey
Downstream
Length Surveyed
145.7 ft.
Total Length
145.7 ft.
Structural Index
3
Structural Quick
3D00
Structural Rating
75
O&M Index
2
O&M Quick
2J00
O&M Rating
112
Overall Index
2
Overall Quick
Overall Rating
187
Pipe schematic from manhole 14 0267 to 14 0459
MH: 14 0267MH: 14 0459downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 02670 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MINERALS17.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start39.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"83.5 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"85.8 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6"143.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish143.3 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish143.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish145.7 ft. AMH - Downstream Manhole, Survey Ends - 14 0459145.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK145.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start - MINERALS

    2 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MINERALS

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    17.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    145.7 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (16)

DistanceCodeObservation
145.7AMH14 0459
39.6TFC
85.8TF
2DAGS
2DAZMINERALS
143.3CM
0MGOCONNECTION AT MH 3 O'CLOCK
0MWM
17.4CM
83.5TFC
145.7MGOCONNECTION AT MH 9 O'CLOCK
0AMH14 0267
145.7MGOCOCKROACHES IN MANHOLE
143.3DAZ
143.3DAGS
0MWL

Properties (7)

additional_info
SC411300
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-06-23T23:24:31-07:00
documentation
PRO PIPE
is_lateral_inspection
false