Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 4, 2020, 07:02 AM
  • 08 0160_08 0159_06042020_001518.mp4

Date
06/04/2020
W/O
833597
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00009
PipeID
P00217
Time
12:02 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7320
Sewer Name
GRACE STREET TRUNK, SECTION 1
City
CARSON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
WO_833597_TV08146_JUN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
12 in.
Upstream MH
08 0159
Downstream MH
08 0160
Dir. of Survey
Upstream
Length Surveyed
229.4 ft.
Total Length
229.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 08 0159 to 08 0160
MH: 08 0159MH: 08 0160upstream0 ft. AMH - Upstream Manhole, Survey Ends - 08 016074.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"114.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"123.8 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6"180.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"186.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"229.4 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK229.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK229.4 ft. AMH - Downstream Manhole, Survey Begins - 08 0159229.4 ft. MWL - Water Level, 20 %of cross sectional area229.4 ft. MWM - Water Mark, 30 %of cross sectional area

Observations (11)

DistanceCodeObservation
42.6TFA
114.5TFC
0MGOCONNECTION AT MH 9 O'CLOCK
154.8TF
49.1TFC
229.4AMH08 0160
105.6TB
0MGOCONNECTION AT MH 3 O'CLOCK
0AMH08 0159
0MWL
0MWM

Properties (5)

additional_info
SC411309
customer
1
datetime
2020-06-04T00:02:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false