Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 7, 2020, 07:01 AM
  • 08 0505_08 0504_762020_001106.mp4

Date
07/07/2020
W/O
0828883
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00021
PipeID
P00564
Time
12:01 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1468
Sewer Name
08 VICTORIA STREET TRUNK
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
04
Purpose
Capital Improvement Program Assesment
Project
202007MDM_VICTORIA_STREET_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
08 0505
Downstream MH
08 0504
Dir. of Survey
Downstream
Length Surveyed
152.7 ft.
Total Length
152.7 ft.
Structural Index
2
Structural Quick
412B
Structural Rating
30
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
34
Pipe schematic from manhole 08 0505 to 08 0504
MH: 08 0505MH: 08 0504downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:10AM0 ft. MWL - Water Level, 5 %of cross sectional area - NO FLOW0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, - SLUDGE IN MH7.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - OUTER LAYER FLAKING8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped10.5 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES - SL10.5 ft. FC - Fracture Circumferential, from 01 to 02 o'clock, within 8 inches of joint: YES - SLIGHT12.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped13.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - UOTER LAYER FLAKING13.8 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - SLDGE23.3 ft. FC - Fracture Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES - SL29.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - OUTER LAYER FLAKING33.7 ft. FC - Fracture Circumferential, from 08 to 10 o'clock, within 8 inches of joint: YES - SL94.8 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES - SL98.9 ft. MGP - General Photograph - PIPE LINER98.9 ft. MMC - Material Change, Other (state in comments) - PIPE HAS A LINER102.4 ft. FC - Fracture Circumferential, from 11 to 01 o'clock, within 8 inches of joint: NO - HAIRLINNE102.4 ft. MGO - General Observation - TORN PIPE LINER START AT 12:00107.4 ft. MGO - General Observation - TORN PIPE LINER END AT 12:00107.4 ft. MMC - Material Change, Other (state in comments) - PIPE LINER FINISH108.1 ft. FC - Fracture Circumferential, from 01 to 02 o'clock, within 8 inches of joint: YES - H110.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped111.9 ft. FC - Fracture Circumferential, from 01 to 04 o'clock, within 8 inches of joint: YES - SL116.5 ft. FC - Fracture Circumferential, from 12 to 04 o'clock, within 8 inches of joint: YES - SL121 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - SLIGHT121.7 ft. MGP - General Photograph - MULTIPLE SLIGHT126.5 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish - SLIGHT131.6 ft. FC - Fracture Circumferential, from 08 to 12 o'clock, within 8 inches of joint: YES - SL141 ft. FC - Fracture Circumferential, from 10 to 11 o'clock, within 8 inches of joint: YES - H152.2 ft. MGO - General Observation - MH CONN 3:00 STUB152.2 ft. MGO - General Observation - MH CONN 9:00 STUB152.7 ft. AMH - Downstream Manhole, Survey Ends - 12:50AM

Observation photos (7)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - OUTER LAYER FLAKING

    7.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - OUTER LAYER FLAKING

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - UOTER LAYER FLAKING

    13.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - UOTER LAYER FLAKING

  • General Photograph - PIPE LINER

    98.9 ft. - General Photograph - PIPE LINER

  • Material Change, Other (state in comments) - PIPE HAS A LINER

    98.9 ft. - Material Change, Other (state in comments) - PIPE HAS A LINER

  • General Observation - TORN PIPE LINER START AT 12:00

    102.4 ft. - General Observation - TORN PIPE LINER START AT 12:00

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - SLIGHT

    121 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - SLIGHT

  • General Photograph - MULTIPLE SLIGHT

    121.7 ft. - General Photograph - MULTIPLE SLIGHT

Observations (33)

DistanceCodeObservation
152.2MGOMH CONN 3:00 STUB
98.9MGPPIPE LINER
121FMSLIGHT
94.8FCSL
13.8SSSUOTER LAYER FLAKING
98.9MMCPIPE HAS A LINER
0AMH12:10AM
126.5FMSLIGHT
110.3TFCCapped
7.5SSSOUTER LAYER FLAKING
107.4MGOTORN PIPE LINER END AT 12:00
102.4FCHAIRLINNE
12.6TFCCapped
29.6SSSOUTER LAYER FLAKING
152.2MGOMH CONN 9:00 STUB
107.4MMCPIPE LINER FINISH
33.7FCSL
121.7MGPMULTIPLE SLIGHT
116.5FCSL
23.3FCSL
131.6FCSL
13.8DSZSLDGE
152.7AMH12:50AM
2DSZSLUDGE IN MH
102.4MGOTORN PIPE LINER START AT 12:00
0MWLNO FLOW
141FCH
10.5FCSL
111.9FCSL
10.5FCSLIGHT
108.1FCH
0MWM
8TFCCapped

Properties (6)

custom_field_three
MULTIPLE SLIGHT FRACTURES,TORN LINER,SPALLING VCP
custom_field_two
2
customer
LACSD
datetime
2020-07-07T00:01:21-07:00
documentation
MARTIN,OLIVER 111,SHADLER,BARR
is_lateral_inspection
false